Our Approach

From assessment to production, and everything after

Five phases that take you from β€œwhere could SI help?” to finished work running in production, with your team confident and the results measured.

What the engineering team sees at each step

The same phases, described for a CTO or IT lead: inputs, architecture, and the outputs you can inspect. Durations are typical for a first system and vary with integrations and approvals.

01 Β· Assess

5 days

We map your business and rank where SI moves the needle. You get a readiness score, top opportunities, ROI estimates.

Audit of current data sources, integrations, governance posture, and tech debt. Outputs: prioritized backlog with effort + impact scoring.

02 Β· Architect

1–2 weeks

Intelligent workflow design: which work goes first, which tools it touches, who owns what, how we measure it.

5-layer architecture: agent prompts + policy gates, tenant-scoped memory schema, n8n orchestration, action tooling, observability spec.

03 Β· Build

2–4 weeks

We deploy. Workflow by workflow. Each one audited, reversible, and live in your tools, not a mock.

n8n workflows wired to your stack via OAuth adapters. Per-action audit log, signed webhooks, RLS-isolated tenant data. Shipped on Vercel + Supabase.

04 Β· Run (optional)

Ongoing

Want us to keep operating it? We can. Want to run it yourself? We hand over the control panel and train your team.

Either path: SLA-backed monitoring, drift detection, monthly enhancement velocity. Or full handover with role-based access and on-call rotation.